top of page
Enerco delivers results.jpg

Industry 4.0 IIoT Case-Study

Digital Transformation + Energy Saving in action

Industry 4.0 IIoT Case-Study

About the Customer :

One of the largest Integrated Steel manufacturer with coal-based Captive Power Plant in the Industrial State of Chhattisgarh.

Problem Statement :

  1. Manual monitoring of furnace content on sampling basis was hampering quality.

  2. Ladles had a queue time of 25-40 minutes resulting in wastage of time.

  3. Massive energy wastage due to wait time.

Solution Proposed :

  1. Fully automated temperature monitoring of every sample.

  2. Queue time optimization.

  3. Ambient temperature monitoring.

Benefits :

  1. Direct saving of 5% on energy bills through reduced consumption by temperature monitoring.

  2. Reduction in production cost as queue time reduced to 10 mins.

  3. Zero human error in monitoring critical parameters.

  4. Better quality products by monitoring and control of critical parameters.

Metal Furnace
Download Industry 4.0 IIoT
Detailed case-study

Thank you for your submission.

Please check your mail box.

ENERCO Energy Solutions LLP

Working towards a better tomorrow 

Enerco visualizes a sustainable, connected and an automated world for a better planet and a better human-race through Energy Conservation and Renewable Energy, Industry 4.0 Digital Transformation and Intelligent Automation.

Sustainable development through use of advanced technology is now a reality and a necessity to be achieved by Companies irrespective of their sector or area of operations.

Our Location

world_map_PNG34.png

Contact Us

53, Maruti Tower,Thakur Complex,

Kandivli (E), Mumbai 400 101

Phone : +91 9890737447

Business Whatsapp : 020 35904874

  • LinkedIn
  • Twitter
  • Facebook
  • Instagram
  • YouTube

© 2020 Enerco Energy Solutions LLP | Privacy policy                                                                                   

Site Created by ENERCO Digital

bottom of page